If there are no cases to consider, the meetings are cancelled.
T-291057.00 Ash Street Pump Station Force Main Replacement
Project consists of the construction and installation of all required upgrades to the existing pumps, gates, valves, instrumentation and controls, as well as a new force main, to the existing sanitary pump station located at 545 NE Lake St.
For more information please call Michelle Neiswender, City Wastewater Engineer at 785-368-4251.
If there are no cases to consider, the meetings are cancelled.
If there are no cases to consider, the meetings are cancelled.
If there are no cases to consider, the meetings are cancelled.
If there are no cases to consider, the meetings are cancelled.
If there are no cases to consider, the meetings are cancelled.
If there are no cases to consider, the meetings are cancelled.
If there are no cases to consider, the meetings are cancelled.
If there are no cases to consider, the meetings are cancelled.